This homeowner needed gas run to their pool heater. We came out on Nov 18 and gave them the estimate in writing. On Nov 19 we came back and ran the new gas piping from the meter to the heater.

Before: the gas meter with no line to the heater. After: the new line tied in at the meter and running along the wall to the pool heater.